China Factory High Quality Ductile Iron Pipe Fittings Mechanical Tee

FM /UL Approved Grooved Fitting U-Bolts/Bolted Mechanical Tee Installation Instruction for Threaded&Grooved Mechanical Tee1. Pipe PreparationClean the gasket sealing surface within 16mm of the hole and inspect the sealing surface visually for defects that may prevent proper sealing of the gasket. Don\'t drill the h

Featured Products

FM /UL Approved Grooved Fitting U-Bolts/Bolted Mechanical Tee 

Superior Quality Ductile Malleable Iron Pipe Fitting Mechanical Tee From China Factory
Installation Instruction for Threaded&Grooved Mechanical Tee

1. Pipe Preparation
Clean the gasket sealing surface within 16mm of the hole and inspect the sealing surface visually for defects that may prevent proper sealing of the gasket. Don't drill the hole on weld line.
2. Remove burrs
Remove any burrs or slug before installation to protect the gasket and prevent leakage.
3. Gasket&Housing Installation
Insert the gasket into outlet housing and make sure the tab in the gasket line up with the tab recessing in the housing. Align outlet housing over the pipe hole making sure that the locating collar is in the pipe hole.
4. Alignment
Align the strap around the pipe, insert the bolts and tighten the nuts.
5. Tighten nuts
Alternatively and evenly tighten the nuts to the specified bolt torque.
6. Installation complete
There should be even gaps on two sides between the upper and lower housings.

Range of products

Rigid coupling, Flexible coupling, 90° Elbow, 45° Elbow, 22.5° Elbow, 11.25° Elbow, Tee, Reducing Tee(Grooved/Threaded), Cross, Reducing Cross(Grooved/Threaded), Mechnical Tee(Grooved/Threaded), Mechnical Cross(Grooved/Threaded), U-bolted Mechnical Tee, Reducer(Grooved/Threaded), Grooved Eccentric Reducer, Grooved Split Flange, Grooved Adaptor Flange, Cap.

Detailed information
Material :Ductile Iron conforming to ASTM A536, Grade 65--45--12
Standard Coat : Epoxy-RAL3000
Optional : 1. painted  2.dacromat  3.galvanized

 

Bolts and Nuts : ISO 898-1class 8.8

Payment term :  T/T, LC at sight
Package : Cartons with pallet/ Wooden case
Delivery time : 25-40 Days


 
 
Size Sheet 
Superior Quality Ductile Malleable Iron Pipe Fitting Mechanical Tee From China Factory

Product Process

Superior Quality Ductile Malleable Iron Pipe Fitting Mechanical Tee From China Factory

 

Company Information

Superior Quality Ductile Malleable Iron Pipe Fitting Mechanical Tee From China Factory

Our Certificate

Superior Quality Ductile Malleable Iron Pipe Fitting Mechanical Tee From China Factory

Packaging and Shipment

Superior Quality Ductile Malleable Iron Pipe Fitting Mechanical Tee From China Factory

FAQ

 
Q: Are you trading company or manufacturer?
A: We are a factory.
Q: How long is your delivery time?
A: Generally 15 days after the down payment. OEM 30 to 90 days.
Q: Do you provide samples? Is it free or extra?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment?
A: Payment<=1000USD, 100% in advance. 
Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us.
 

Contact Us

WeChat QR CODE


 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours